CLIENT |
LOCATION |
PROJECT DESCRIPTION |
INT. REF |
SCOPE |
|
NG Grain LNG |
Partington, UK |
Study for the management of boil off gas given potential future modifications to the site |
1889 |
E |
|
National Grid |
Various, UK |
Engineering support to the L&M detailed design and construction team for the compressor station upgrade projects at Hatton, St. Fergus and Kirriemuir |
1890 |
E |
|
Moorland Energy |
NE England |
Concept design, planning support, FEED and full specification of long lead items for the Ryedale Gas Project. |
1876 |
E |
|
National Grid |
Carrington, UK |
Detailed design for a minimum offtake connection at 36” NTS feeder at Carrington. |
1841 |
E |
|
National Grid Grain LNG |
Grain, UK |
Conceptual design for a 2nd cryogenic LNG import line from the jetty to the terminal. Scope to include LNG import and recirculation as well as vapour return. Assessments to include surge and stress analysis for different modes of operation, tie ins, CAPEX and programme. |
1863 |
E |
|
Oil Plus |
UK, Sudan |
FEED for a water disposal project in the oilfields of Sudan for Petrodar |
1838 |
E |
|
National Grid Grain LNG |
Grain, UK |
Conceptual design of modifications to the MP gas main to incorporate injection of LPG and nitrogen into a new static mixer for quality adjustment. Formal SIL analysis also undertaken with the aim of reducing SIL level. |
1855 |
E |
| S = Study RA = Risk Analysis AE = Authority Engineering R = Route Selection and Survey |
E = Engineering P = Procurement PM = Project Management CM = Construction Management |
C = Commissioning and Start-up PR = Process TR = Training and Personnel T = Turnkey |
Experience List |